Amine scrubbing BGAA biogas upgradingDGE
Aminwäsche BGAA Biogasaufbereitung
Amine scrubbing BGAA biogas upgrading
DGE
Aminwäsche BGAA Biogasaufbereitung
VB додава се ДДВ
80.000 €
Состојба
Користено
Локација
Weiskirchen 

Сликите прикажуваат
Прикажи карта
Податоци за машината
- Ознака на машината:
- Amine scrubbing BGAA biogas upgrading
- произведувач:
- DGE
- Број на машина:
- -
- Состојба:
- генерално ремонтиран (користено)
- функционалност:
- целосно функционален
Цена и локација
VB додава се ДДВ
80.000 €
- Локација:
- Zum Eichenlaubhof, 1, 66709 Saarland - Weiskirchen, DE
Повикајте
Технички детали
- Притисок:
- 0,1 греда
Детали за понудата
- ID на огласот:
- A19034706
- ажурирање:
- последно на 07.08.2025
Опис
Selling an amine scrubber, for example, for upgrading biogas to biomethane (natural gas quality).
Capacity in the biogas range: 450-550 Nm³/expandable to 650 Nm³/h
Up to 99.9% methane purity
Methane slip: 0.1%
Electricity requirement: 0.06 kWh/m³ raw gas
Heat requirement: 0.65 kWh/m³ raw gas
Simple CO2 extraction possible - liquefaction/dry ice
Iijdpfswf Rwwjx Adhoh
No exhaust gas treatment required compared to the membrane process with a lean gas burner - clear cost savings
Scrubber regeneration is equipped with heat recovery at 55/65 degrees Celsius
The plant can be expanded for the production of LNG with a CO2 content of less than 30 ppmv and less than 0.1 ppmv of water.
The amine process is exceptionally robust against impurities in the biogas stream and is characterized by high Plant availability is a factor. Compared to the membrane process, the amine scrubbing technology is significantly less sensitive to volatile organic compounds (VOCs; terpenes, ketones, siloxanes).
Plant immediately available/short delivery time
If you have any questions or are interested, please contact us by phone.
Amine scrubbing BGAA Biogas upgrading Biomethane Biogas CHP CO2 separator CNG LNG
Огласот е автоматски преведен. Можно е да има грешки во преводот.
Capacity in the biogas range: 450-550 Nm³/expandable to 650 Nm³/h
Up to 99.9% methane purity
Methane slip: 0.1%
Electricity requirement: 0.06 kWh/m³ raw gas
Heat requirement: 0.65 kWh/m³ raw gas
Simple CO2 extraction possible - liquefaction/dry ice
Iijdpfswf Rwwjx Adhoh
No exhaust gas treatment required compared to the membrane process with a lean gas burner - clear cost savings
Scrubber regeneration is equipped with heat recovery at 55/65 degrees Celsius
The plant can be expanded for the production of LNG with a CO2 content of less than 30 ppmv and less than 0.1 ppmv of water.
The amine process is exceptionally robust against impurities in the biogas stream and is characterized by high Plant availability is a factor. Compared to the membrane process, the amine scrubbing technology is significantly less sensitive to volatile organic compounds (VOCs; terpenes, ketones, siloxanes).
Plant immediately available/short delivery time
If you have any questions or are interested, please contact us by phone.
Amine scrubbing BGAA Biogas upgrading Biomethane Biogas CHP CO2 separator CNG LNG
Огласот е автоматски преведен. Можно е да има грешки во преводот.
Доставувач
Забелешка: Регистрирајте се бесплатно или најавете се, за пристап до сите информации.
Регистриран од: 2023
Испрати барање
Телефон & Факс
+49 6876 ... огласи
Вашиот оглас беше успешно избришан
Се случи грешка