FAL engine assembly and testing lineFAL
FAL engine assembly and testing line
FAL
Година на производство
2020
Состојба
Користено
Локација
Czechowice-Dziedzice 

Основни податоци
- Ознака на машината:
- FAL engine assembly and testing line
- Произведувач:
- FAL
- Година на производство:
- 2020
- Состојба:
- половен
Цена и локација
- Почеток на аукцијата:
- 01.11.2026 во 15:55 часот
- Крајот на аукцијата:
- 31.12.2026 во 12:00 часот
- Локација:
- Czechowice-Dziedzice, Polen

Повикајте
Детали за понудата
- ID на огласот:
- A23339912
- Референтен број:
- 2970001
- Ажурирање:
- последно на 16.11.2026
Опис
The lot consists of:
(1) FAL Motor Assembly and Testing Line (1)
Technical Details:
FAL Motor Assembly Line 1 – Technical Description
The FAL Motor Assembly Line 1 is a fully integrated production system for the assembly and testing of electric motors, located at the Valeo plant in Poland. The line is designed for high-volume automotive production and combines automated, semi-automated, and manual processes within a continuous material flow layout.
Basic information:
Cycle time: approx. 86 seconds per unit
TRP/OEE: approx. 85%
Total surface area: approx. 855 m²
Process Overview
The line consists of 25 sequential stations covering the complete assembly process from component loading to final packaging and reintegration.
Initial assembly and housing preparation:
Hfodpj Akk Rkefx Afaop
OP10: Robot-based component loading
OP20: Shrinking process (heating inner housing and joining stator)
OP30: Cooling tunnel
OP40: Manual assembly of X-ring and D-ring
OP50: Pre-assembly of outer housing
Core assembly and rotor integration:
OP60: Joining inner housing to outer housing
OP70: Rotor magnetization and measurement
OP80: Pre-assembly of A-shield and rotor insertion
OP90: Attaching A-shield to outer housing
OP110: Screwing A-shield
Intermediate assembly and component integration:
OP135: Manual interconnector assembly
OP136FA / OP136PA: Counter ring insertion, cooling cover joining, vent assembly
End-of-line handling and testing:
OP140: Transfer to EOL loop
OP150–190: End-of-line testing
OP230/240: Leak testing (test 1 and test 2)
OP245: Rotation test and EM graver verification
OP260: Laser marking and stamping
Final assembly and packaging:
OP270: Assembly of plugs, transportation cover, and cap
OP280: Final inspection and packaging
OP290: Reintegration process
Огласот е автоматски преведен. Можно е да има грешки во преводот.
(1) FAL Motor Assembly and Testing Line (1)
Technical Details:
FAL Motor Assembly Line 1 – Technical Description
The FAL Motor Assembly Line 1 is a fully integrated production system for the assembly and testing of electric motors, located at the Valeo plant in Poland. The line is designed for high-volume automotive production and combines automated, semi-automated, and manual processes within a continuous material flow layout.
Basic information:
Cycle time: approx. 86 seconds per unit
TRP/OEE: approx. 85%
Total surface area: approx. 855 m²
Process Overview
The line consists of 25 sequential stations covering the complete assembly process from component loading to final packaging and reintegration.
Initial assembly and housing preparation:
Hfodpj Akk Rkefx Afaop
OP10: Robot-based component loading
OP20: Shrinking process (heating inner housing and joining stator)
OP30: Cooling tunnel
OP40: Manual assembly of X-ring and D-ring
OP50: Pre-assembly of outer housing
Core assembly and rotor integration:
OP60: Joining inner housing to outer housing
OP70: Rotor magnetization and measurement
OP80: Pre-assembly of A-shield and rotor insertion
OP90: Attaching A-shield to outer housing
OP110: Screwing A-shield
Intermediate assembly and component integration:
OP135: Manual interconnector assembly
OP136FA / OP136PA: Counter ring insertion, cooling cover joining, vent assembly
End-of-line handling and testing:
OP140: Transfer to EOL loop
OP150–190: End-of-line testing
OP230/240: Leak testing (test 1 and test 2)
OP245: Rotation test and EM graver verification
OP260: Laser marking and stamping
Final assembly and packaging:
OP270: Assembly of plugs, transportation cover, and cap
OP280: Final inspection and packaging
OP290: Reintegration process
Огласот е автоматски преведен. Можно е да има грешки во преводот.
Вашиот оглас беше успешно избришан
Се случи грешка





















































