FAL engine assembly and testing line
FAL

Година на производство
2020
Состојба
Користено
Локација
Czechowice-Dziedzice Полска
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL engine assembly and testing line FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL

Основни податоци

Ознака на машината:
FAL engine assembly and testing line
Произведувач:
FAL
Година на производство:
2020
Состојба:
половен

Цена и локација

Почеток на аукцијата:
01.11.2026 во 15:55 часот
Крајот на аукцијата:
31.12.2026 во 12:00 часот

Локација:
Czechowice-Dziedzice, Polen Полска
Повикајте

Детали за понудата

ID на огласот:
A23339912
Референтен број:
2970001
Ажурирање:
последно на 16.11.2026

Опис

The lot consists of:
(1) FAL Motor Assembly and Testing Line (1)

Technical Details:
FAL Motor Assembly Line 1 – Technical Description
The FAL Motor Assembly Line 1 is a fully integrated production system for the assembly and testing of electric motors, located at the Valeo plant in Poland. The line is designed for high-volume automotive production and combines automated, semi-automated, and manual processes within a continuous material flow layout.

Basic information:
Cycle time: approx. 86 seconds per unit
TRP/OEE: approx. 85%
Total surface area: approx. 855 m²
Process Overview

The line consists of 25 sequential stations covering the complete assembly process from component loading to final packaging and reintegration.

Initial assembly and housing preparation:
Hfodpj Akk Rkefx Afaop
OP10: Robot-based component loading
OP20: Shrinking process (heating inner housing and joining stator)
OP30: Cooling tunnel
OP40: Manual assembly of X-ring and D-ring
OP50: Pre-assembly of outer housing

Core assembly and rotor integration:
OP60: Joining inner housing to outer housing
OP70: Rotor magnetization and measurement
OP80: Pre-assembly of A-shield and rotor insertion
OP90: Attaching A-shield to outer housing
OP110: Screwing A-shield

Intermediate assembly and component integration:
OP135: Manual interconnector assembly
OP136FA / OP136PA: Counter ring insertion, cooling cover joining, vent assembly

End-of-line handling and testing:
OP140: Transfer to EOL loop
OP150–190: End-of-line testing
OP230/240: Leak testing (test 1 and test 2)
OP245: Rotation test and EM graver verification
OP260: Laser marking and stamping

Final assembly and packaging:
OP270: Assembly of plugs, transportation cover, and cap
OP280: Final inspection and packaging
OP290: Reintegration process

Огласот е автоматски преведен. Можно е да има грешки во преводот.

Доставувач

Регистриран од: 2011

72 Огласи онлајн

Trustseal icon

Телефон & Факс

+49 8151 ... огласи